Home > Products > Arrays, Edge Type, Mezzanine (Board to Board) >Rectangular Connector Adapters > Electronic component TE Connectivity 3-292216-4 revised per engineering change order ECO 11 005033

Electronic component TE Connectivity 3-292216-4 revised per engineering change order ECO 11 005033

Manufacturer:
TE Connectivity
Description:
2 1.5mm Rectangular Connector Adapters RoHS
Category:
Arrays, Edge Type, Mezzanine (Board to Board)/Rectangular Connector Adapters
Specifications
Number Of Rows:
2
Row Spacing:
1.5mm
Mfr. Part #:
3-292216-4
Model Number:
3-292216-4
Introduction

Product Overview

This product is a revised component, updated per ECO 11 005033 on April 19, 2011, by RK HMR P. Further details regarding its specific function, advantages, and application scenarios are not provided in the source text.

Product Attributes

  • Revision Status: Revised per ECO 11 005033
  • Revision Date: 19APR11
  • Initiated By: RK HMR P

Technical Specifications

No specific technical specifications, models, dimensions, voltage, weight, or ratings are provided in the source text.


2411272144_TE-Connectivity-3-292216-4_C17445349.pdf

Send RFQ
Stock:
MOQ: